Liquefied natural gas, or LNG, is natural gas cooled until it becomes a liquid so that ships can carry it across oceans. Canada produces large volumes of natural gas, but until 2025 it had no large-scale LNG export terminal. The first one, LNG Canada at Kitimat in British Columbia, shipped its first cargo in June 2025 and now sends LNG carriers across the Pacific. This page describes what an LNG export terminal does, how the Kitimat plant is built and supplied through the Coastal GasLink pipeline, which ships serve it, which other projects have been proposed, and where facts could not be confirmed. For the wider picture of tankers and oil terminals see oil and LNG marine transport in Canada.
What an LNG export terminal does
An LNG export terminal is an industrial site on the coast that receives pipeline gas, cleans it, cools it to a liquid, stores it and loads it onto ships. The cooling step is called liquefaction and takes place in units known as trains. Each train is a complete line of equipment, and a terminal grows by adding trains. Capacity is normally stated in million tonnes per year, abbreviated as mtpa.
The opposite kind of facility is an import terminal. It unloads liquefied gas from a ship, warms it back to a gas, which is called regasification, and feeds it into a pipeline. Canada has used import capacity on the Atlantic coast since 2009, while the export side is a development of the 2020s on the Pacific coast.
The LNG export terminal is also a marine facility. A dedicated jetty receives the carriers, and the port waters around it come under the usual rules for ports, pilotage and safety described on the pages about Canadian pilotage, ports and dredging and Canadian marine safety and liability.
LNG Canada at Kitimat
LNG Canada is a joint venture founded on 24 November 2011 and headquartered in Calgary. It built the export facility at Kitimat, a town in northwestern British Columbia at the head of the Kitimat Arm of Douglas Channel. Kitimat had 8,236 residents at the 2021 census, lies about 63 kilometres south of Terrace, has Prince Rupert about 207 kilometres northwest by road, and has a year-round deepwater port.
Five companies hold the venture.
| Shareholder | Share |
|---|---|
| Shell | 40 percent |
| Petronas | 25 percent |
| PetroChina | 15 percent |
| Mitsubishi Corporation | 15 percent |
| Korea Gas Corporation | 5 percent |
Shell leads the project. The shareholders approved the final investment decision on 1 October 2018. Reference sources estimate the total investment at about 40 billion dollars, a figure that includes the pipeline and the liquefaction and storage plant. The environmental assessment certificate had been issued in June 2015. JGC Fluor, a joint venture of the Japanese company JGC and the American company Fluor, handled engineering and construction.
Trains, capacity and start-up
The first phase has two liquefaction trains with a combined capacity of 14 million tonnes per year. The original plan allowed for two more trains, which would have raised the total to 26 million tonnes. Wikipedia reports that on 29 September 2026 Shell announced a final investment decision to double the capacity to 28 million tonnes per year. That item rests on a single open source and is listed under needs_review in this page.
Start-up followed a short timeline.
- June 2025: the plant produced its first LNG and shipped its first cargo.
- November 2025: the second train began operating, after more than 20 cargoes had shipped.
- 23 February 2026: 50 cargoes had been shipped.
The cargoes go mainly to Asian markets. In October 2018 Toho Gas and Tokyo Gas signed heads of agreement for LNG purchases over 15 and 13 years with a subsidiary of Mitsubishi.
Haisla Nation and local participation
The Haisla Nation holds the land and waters around Kitimat Arm and has been involved in LNG proposals since 2004. LNG Canada works with First Nations, notably the Haisla. As of November 2019, about one billion dollars of contracts had gone to British Columbia companies, of which 558 million dollars went to firms and First Nations in the Kitimat region.
Coastal GasLink pipeline
The gas that feeds the Kitimat plant is produced in the Montney Formation near Dawson Creek in northeastern British Columbia. The Coastal GasLink pipeline carries it to the terminal. TC Energy built and operates the line, and it was backed by 25-year transportation agreements with the LNG Canada partners.
| Feature | Figure |
|---|---|
| Length | 670 kilometres |
| Route | From near Dawson Creek to Kitimat |
| Diameter | 1,219 millimetres (48 inches) |
| Initial capacity | 2.1 billion cubic feet per day |
| Possible expanded capacity | About 5 billion cubic feet per day |
Construction began in 2019. The initial estimate was 6.6 billion dollars, and by the end of July 2022 the cost had risen to 11.2 billion dollars. In December 2019 AIMCo and KKR agreed to buy a 65 percent equity interest, and the deal closed on 25 May 2020. Installation was complete in October 2023, and the pipeline entered commercial service in November 2024.
The route crossed the territory of the Wet'suwet'en Nation. Hereditary chiefs opposed the project and say about 22,000 square kilometres of their territory was never ceded, while elected band councils signed agreements supporting it. Court injunctions led to RCMP enforcement in 2019 and 2020 and to protests across the country. A British Columbia Supreme Court decision in April 2021 rejected a challenge to the extension of the environmental certificate, and blockades at the Morice River were removed in November 2021.
LNG carriers and shipping on Douglas Channel
LNG carriers are specialized ships. They hold the gas as a liquid at about minus 162 degrees Celsius in insulated tanks. Four containment systems are used in new ships: two self-supporting designs, the spherical Moss tank and the prismatic IHI tank, and two membrane designs, Technigaz Mark III and GT96. Small carriers hold under 40,000 cubic metres, while the Q-Flex and Q-Max classes built from 2005 carry 210,000 to 266,000 cubic metres. A small share of the cargo, 0.1 to 0.25 percent a day, warms and turns to boil-off gas, which many carriers use as fuel. One source counted 772 active LNG carriers worldwide in 2023, a figure that includes floating storage units.
Carriers that load at Kitimat travel along Douglas Channel, a fjord about 90 kilometres long from the head of Kitimat Arm to Wright Sound, or about 140 kilometres to open water in Hecate Strait. The channel was already a busy shipping artery because of the aluminum smelter, which receives bauxite and ships out metal. Reference sources describe LNG Canada as bringing new, sensitive ship traffic to the channel. After leaving the coast the carriers head to Asia.
The Oil Tanker Moratorium Act of 2019 bans tankers carrying more than 12,500 tonnes of crude or persistent oil from the north coast of British Columbia, and it names Kitimat in its explanation. LNG and refined products fall outside the Act, so LNG carriers are not covered. Other rules still apply to the ships and to the voyage. Pages on oil spill response in Canada, whales and vessel noise and ship emissions and green shipping describe the regimes most often cited in public debate about coastal traffic.
Other Canadian LNG export projects
Several other liquefied natural gas projects have been proposed or built in Canada. Only a few details could be verified from open reference sources, and the status of the rest should be checked on current project and regulator pages.
Kitimat LNG at Bish Creek
An earlier project, Kitimat LNG, was proposed at Bish Creek near Kitimat to export gas from the Western Canadian Sedimentary Basin to Asia. In July 2014 Apache Corporation reportedly planned to leave the project. A separate Haisla proposal, the BC LNG Export Cooperative, received National Energy Board approval in February 2012 for exports of up to 26 million tonnes over 20 years, with a single train processing 125 million cubic feet of gas per day. Whether that start-up took place is not stated in the source.
Cedar LNG and Woodfibre LNG
Since 2023 the Haisla Nation has partnered with Pembina Pipeline on Cedar LNG, a project near Kitimat with a stated cost of 4 billion dollars. Woodfibre LNG is described as a 5.1 billion dollar electric export facility under construction near Squamish, with work scheduled to start in September 2023. The reference pages give no capacity, ownership split or completion date for either project, so those figures are not stated here.
Tilbury, Delta
The FortisBC facility at Tilbury Island in Delta, British Columbia, started operating in 1971. It liquefies 5,000 gigajoules of gas a day and stores up to 600,000 gigajoules, and an expansion was under way that would add 34,000 gigajoules of liquefaction and 1.1 million gigajoules of storage. In November 2017 True North Energy shipped 17 tonnes of LNG from Tilbury to China, described as Canada's first LNG export to that country.
Canaport LNG at Saint John
Canaport LNG at Mispec Point near Saint John, New Brunswick, is an import terminal. It was commissioned in 2008, received its first shipment in June 2009 and has a nominal capacity of 1.2 billion cubic feet per day, with three insulated storage tanks and a jetty. In 2018 it was described as Canada's only large-scale LNG terminal. Repsol bought the 25 percent share held by Irving Oil in August 2021, and the terminal was renamed Saint John LNG in November 2021. It receives LNG from sources such as the North Sea and the Caribbean and supplies Atlantic Canada and the northeastern United States.
Why the terminals matter for Canadian shipping
LNG is a different kind of cargo from the bulk goods that dominate Canadian marine trade. The page on Canadian shipping statistics and the page on Canada's international trade by sea cover the cargo background, and the Port of Prince Rupert and the Port of Vancouver are the two large container and bulk gateways on the same coast. Terms such as boil-off, train and mtpa appear in the shipping glossary.
Frequently asked questions
What is the first LNG export terminal in Canada?
LNG Canada at Kitimat, British Columbia, is described as the first large-scale commercial LNG export operation in the country. It produced its first LNG and shipped its first cargo in June 2025.
Who owns LNG Canada?
Shell holds 40 percent, Petronas 25 percent, PetroChina 15 percent, Mitsubishi Corporation 15 percent and Korea Gas Corporation 5 percent.
How much LNG can the Kitimat terminal produce?
Two trains give a capacity of 14 million tonnes per year. The original plan allowed for two more trains and 26 million tonnes. Wikipedia reports a September 2026 decision to double the capacity to 28 million tonnes per year, which is not confirmed on an official page.
What is the Coastal GasLink pipeline?
It is a 670-kilometre pipeline from near Dawson Creek to Kitimat with an initial capacity of 2.1 billion cubic feet per day. TC Energy operates it, installation was complete in October 2023 and commercial service began in November 2024.
Where do the LNG carriers go from Kitimat?
They sail down Douglas Channel to the Pacific and carry cargoes mainly to Asian markets.
Does the Oil Tanker Moratorium Act apply to LNG carriers?
No. The Act covers crude and persistent oil above 12,500 tonnes on the north coast of British Columbia, and LNG is outside its scope.
Last updated 2026-11-22
Sources
- Wikipedia, LNG Canada: https://en.wikipedia.org/wiki/LNG_Canada
- Wikipedia, Coastal GasLink Pipeline: https://en.wikipedia.org/wiki/Coastal_GasLink_Pipeline
- Wikipedia, Kitimat: https://en.wikipedia.org/wiki/Kitimat
- Wikipedia, Douglas Channel: https://en.wikipedia.org/wiki/Douglas_Channel
- Wikipedia, Haisla Nation: https://en.wikipedia.org/wiki/Haisla_Nation
- Wikipedia, Squamish, British Columbia: https://en.wikipedia.org/wiki/Squamish,_British_Columbia
- Wikipedia, Liquefied natural gas in Canada: https://en.wikipedia.org/wiki/Liquefied_natural_gas_in_Canada
- Wikipedia, Canaport LNG: https://en.wikipedia.org/wiki/Canaport_LNG
- Wikipedia, Liquefied natural gas carrier: https://en.wikipedia.org/wiki/Liquefied_natural_gas_carrier
- Transport Canada, Oil Tanker Moratorium on British Columbia's north coast: https://tc.canada.ca/en/marine-transportation/marine-safety/oil-tanker-moratorium-british-columbia-s-north-coast