Canadian Shipping

Great Lakes Shipping Season Dates and Winter Layup

Great Lakes shipping runs on a calendar set by ice, lock maintenance and the opening and closing notices of two lock operators. The St. Lawrence Seaway Management Corporation and its American counterpart schedule the Montreal-Lake Ontario section and the Welland Canal. The U.S. Army Corps of Engineers sets the dates for the Soo Locks at Sault Ste. Marie. Between them, the two groups of locks decide when lakers and ocean vessels can enter or leave Lake Superior and the lower lakes.

This page covers the season calendar and the layup logistics that follow from it. It gives the opening and closing dates for 2025 and 2026, the historical records that are documented, the reasons the season ends, what happens to vessels and cargo in winter, and the proposals to lengthen the season. Icebreaking itself is covered on a separate page about icebreaking and winter navigation on the Great Lakes.

The shape of a season

The navigation season on the Great Lakes and the St. Lawrence Seaway usually starts in the second half of March and ends between late December and mid-January. Wikipedia's description of lake freighters gives the pattern as late March to the following mid-January. The Welland Canal entry says the canal regularly opens in late March and runs through December. The two descriptions differ slightly because the dates depend on which lock is being discussed and on whether the closing date is scheduled or actual.

The route as a whole is described on the page on the Great Lakes-St. Lawrence Seaway system, and the wider picture is in the overview of Great Lakes marine shipping.

Seaway dates for 2025 and 2026

The Seaway publishes opening and closing dates in numbered notices to shipping. Notice 2 of 2025, dated February 20, 2025, set the opening of the 2025 navigation season for both the Montreal-Lake Ontario section and the Welland Canal at 0800 hours on March 22, 2025. It added that ship transits were subject to weather and ice conditions and that some areas could carry restrictions until lighted navigation aids had been installed.

The same notice listed the target closing dates:

Section Target closing, 2025 season Reopening target, 2026
Montreal-Lake Ontario January 5, 2026 March 22, 2026
Welland Canal January 10, 2026 March 22, 2026

The notice described January 5, 2026 for the Montreal section as year 2 of a pilot program. That wording points to an extended closing date that is tested over several seasons before it is adopted as a standing schedule.

Notice 14 of 2025, issued on October 17, 2025, confirmed these dates and added operating rules for the end of the season. The operators waived the usual operational surcharges on December 21, 22, 23 and 24. Any transit of the Montreal-Lake Ontario section after 23:59 hours on December 24 would be subject to prior written agreement arranged through the St. Lambert office, and all ships had to be clear of the section by 12:00 on January 5, 2026. In the Welland Canal, transits after 23:59 hours on December 26 would also require prior written agreement, arranged through the St. Catharines office, and ships had to be clear of the canal by 12:00 on January 10, 2026.

The January 2026 closing

Winter weather did not follow the schedule in 2026. A Transport Canada briefing says that cold temperatures delayed the winter closure. The Montreal-Lake Ontario section closed on January 12 instead of January 5, and the Welland Canal closed on January 13 instead of January 10. The briefing also states that the Seaway was scheduled to reopen on March 22, 2026. A public safety notice issued on January 9, 2026 said the Seaway was operating under extreme winter conditions in the Montreal-Lake Ontario corridor and that a notice would be issued once the season closed.

Historical dates and records

Documented historical figures on opening and closing are scattered, and the dates below are the ones confirmed from open sources.

The Soo Locks calendar

The Soo Locks follow a different rule. Their season is written into U.S. federal regulation, in 33 CFR 207.440. Under the opening provision, at least one lock is placed in operation on March 25, and more locks are added as traffic requires. Under the closing provision, the locks stay open only for downbound vessels that leave a Lake Superior port before midnight on January 14 and for upbound vessels that pass Detour before midnight on January 15. Vessel owners are asked to report in advance the name of a vessel and the time of its departure so that a lock can stay in operation for it. The regulation also allows the dates to change in an emergency involving a vessel disaster or other extraordinary circumstances.

Wikipedia describes the winter closure as running from January through March and notes that the months without traffic are used for inspection and maintenance of the locks. The Seaway's Notice 2 of 2025 gave March 25, 2025 as the scheduled opening, and its Notice 14 gave January 15, 2026 as the scheduled closing. Those dates match the regulation. The Soo Locks pass an average of about 10,000 ships a year, and the 1,200-foot Poe Lock is the only lock able to handle the largest lake freighters, which is why a maintenance outage there draws attention across the system. More detail is on the page about the Soo Locks and the St. Marys River.

Why the season closes

Two reasons are given in the sources: ice and maintenance. They are linked, since the maintenance period is placed in the window when ice would stop ships anyway.

Ice

Ice forms on the lakes in the weeks after the heaviest shipping months, and it reaches peak severity in the middle of winter. The Welland Canal entry says the canal closes in winter because of hazardous weather. A report by the U.S. Government Accountability Office on Great Lakes winter shipping found that vessel-based commerce declines in winter, primarily because of lock closures and weather conditions. The same report found an association between ice cover and cargo volume: on average, each 1 percent increase in average ice coverage in the region was linked with a 1 percent decrease in total Great Lakes cargo volume. The report also states that ice coverage was generally not associated with the economic indicators it examined, such as regional unemployment and unfilled steel orders, because industries find ways to absorb the delays.

Lock maintenance

The Transport Canada briefing says the annual winter closure gives the Seaway corporation time for maintenance and capital projects, and the 2024 press release mentions annual multi-million-dollar winter maintenance and infrastructure renewal programs. At the Soo Locks the closure is used for inspection and maintenance.

Winter navigation measures at the edges of the season

The weeks before the January closing and after the March opening are the most exposed to ice, and several measures operate there. The details of icebreaking, ice routing and the Canadian and American coast guards are in the separate page on icebreaking and winter navigation, and the Canadian fleet that supports it is described on the page about the Canadian Coast Guard fleet. Only the elements that bear on the calendar are listed here.

The GAO report divides the ice season of the U.S. Coast Guard into three phases with dates:

Phase Period What happens
Extended navigation December through January 15 Vessels, assisted by the Coast Guard, move through developing ice to complete their last shipments before returning to home port for winter maintenance
Winter navigation January 15 through March 25 Locks closed, most vessels berthed at home port, shipping largely reduced to limited interlake transfers
Spring breakout March 25 through the end of the ice season Vessels line up around the Soo Locks to deliver or collect their first shipments; the Coast Guard prepares tracks two weeks before the reopening

Winter layup of lakers

When the season ends, lakers go into winter layup. A laker is a bulk carrier built for the lakes, and the types are covered on the page about Canadian lakers and vessel types. The Great Lakes fleet has shrunk over time: about 300 lakers worked the lakes in the mid-twentieth century, according to Wikipedia, and fewer than 140 were active in the early twenty-first century. A group of thirteen 1,000-footers, all U.S.-flagged and longer than 1,000 feet, forms the top of the fleet, and the longest, the Paul R. Tregurtha, measures 1,013.5 feet.

Layup is the period when a vessel is tied up at a home port or a layup berth, crews are reduced, and repairs and inspections are done. The GAO report describes winter navigation as a time when most vessels are berthed at home port and when port authorities note fewer vessels able to berth at shipyards after the lock closure, which suggests that yard space is a limit on winter work. Wikipedia photographs show the Paul R. Tregurtha in winter layup at Sturgeon Bay, Wisconsin, on February 19, 2008, and the Cason J. Callaway laid up there in 2021.

The traditional last month of shipping was November. Wikipedia notes that from 1900 to 1950 over half of strandings and one-third of foundering losses on the lakes occurred in November. Modern vessels, icebreaker support and ice reports have made late-season operations safer, and the current schedules run into January. The historical side of those losses is described on the page about Great Lakes shipwrecks.

Effects on cargo flows

The calendar shapes when cargo moves as much as how much moves. Lake shipping carries bulk commodities for industries that run all year, so the cargo is moved in a long season and stored for the closed months.

Iron ore and coal

Iron ore is the dominant cargo of the lakes. Wikipedia reports average annual shipments on the Great Lakes for 2018 to 2022 of 80.4 million tons, of which iron ore was 42.3 million tons, limestone 22.9 million tons and coal 10.0 million tons, and it gives 81.4 million tons for 2023. Large U.S. vessels carried 79 percent of the iron ore, moving it from U.S. mines to U.S. mills. Canadian ore flows are described on the page about Canadian iron ore shipping.

Steel producers prepare for the closure ahead of time. The GAO report says that two major Great Lakes steel producers told its auditors they stockpile an average of 90 to 100 days of iron ore inventory. Stakeholders gave other forms of redundancy: switching to trucking or rail, and front-loading deliveries to customers before the ice season. The report concludes that industries may mitigate delays caused by ice, for example by stockpiling iron ore to maintain steel production through the winter. The 90-to-100-day figure from two producers is not a system-wide average.

Grain

Grain follows a similar seasonal logic, because export vessels must leave before the Seaway closes. The 2024 press release reports that grain transiting the Seaway system in 2023 reached 10.4 million tonnes, with Canadian grain up more than 11 percent. The mechanics of moving prairie grain to Thunder Bay and the lower St. Lawrence are covered on the page about Canadian grain and bulk cargo shipping. No open source was found that quantifies grain stockpiling at terminals before the closure, so the page does not give a number for it.

Proposals to extend the season

The Transport Canada briefing on the Seaway describes the extension of the season as an ongoing subject and records several positions without endorsing them.

The notices to shipping show the extension in practice. Notice 2 of 2025 called the Montreal section's January 5, 2026 closing year 2 of a pilot program, and the 2023 season was announced as the longest scheduled in history. The U.S. rules for the Soo Locks have not moved, since the regulation still sets March 25 and January 14 and 15 as the edges of the season.

The GAO report adds that the Coast Guard anticipates needing at least $3 billion in lifecycle costs to replace and acquire vessels for domestic icebreaking. Season length also depends on that capacity. Toll and competitiveness questions are covered on the page about Seaway tolls and competitiveness.

Frequently asked questions

When does the St. Lawrence Seaway open each year?

The season usually opens in the second half of March. In 2025 both the Montreal-Lake Ontario section and the Welland Canal were scheduled to open at 0800 hours on March 22, and the target for 2026 was also March 22. The earliest recorded Welland Canal opening was March 20, 2007, matched in 2008.

When does the Seaway close for winter?

The closing dates fall between late December and mid-January. For the 2025 season the target closings were January 5, 2026 for the Montreal-Lake Ontario section and January 10, 2026 for the Welland Canal. Cold weather delayed the closure, and the sections closed on January 12 and January 13, 2026, according to Transport Canada.

When are the Soo Locks closed?

Federal regulation opens at least one lock on March 25 and stops operation after the January 14 and January 15 cut-offs for downbound and upbound vessels. The locks are therefore closed from mid-January to late March, a period used for inspection and maintenance. The dates may be changed in an emergency.

What was the longest Seaway season on record?

Transport Canada reports a record of 284 days for 2011, from March 22 to December 30. The 2023 season was announced as the longest scheduled in history, with closings on January 5 and January 7, 2024. The two statements measure different things, an actual season length and a scheduled one.

What happens to lakers in winter?

Most go into layup at their home ports or at layup berths. The GAO describes winter navigation as a period in which most vessels are berthed and shipping is largely limited to interlake transfers. Repairs and inspections are scheduled for that period, and the Coast Guard plans its own maintenance while the locks are closed.

How do steel mills keep running while the lakes are closed?

They build stockpiles. Two major Great Lakes steel producers told the GAO that they keep an average of 90 to 100 days of iron ore inventory, and other measures include rail and trucking and front-loading deliveries before the ice season.

Last updated 2026-11-18

Sources

  1. St. Lawrence Seaway Management Corporation and Great Lakes St. Lawrence Seaway Development Corporation, Seaway Notice 2 of 2025: https://greatlakes-seaway.com/wp-content/uploads/2025/02/notice20250220_en.pdf
  2. Seaway Notice 14 of 2025, closing of the 2025 navigation season: https://greatlakes-seaway.com/wp-content/uploads/2025/10/notice20251017_en.pdf
  3. Press release of 31 January 2024, 2023 results: https://greatlakes-seaway.com/wp-content/uploads/2024/01/seaway_Press_Release_240131_en.pdf
  4. Great Lakes St. Lawrence Seaway Development Corporation, St. Lawrence Seaway Begins 67th Navigation Season, 1 April 2025: https://www.seaway.dot.gov/about/press-release-april-1-2025-st-lawrence-seaway-begins-67th-navigation-season
  5. Transport Canada, Continued operation of the St. Lawrence Seaway: https://tc.canada.ca/en/binder/12-pic-st-lawrence-seaway
  6. Transport Canada, Transportation in Canada 2011, Marine Transportation: https://tc.canada.ca/en/corporate-services/transparency/corporate-management-reporting/transportation-canada-annual-reports/transportation-canada-2011/marine-transportation
  7. Electronic Code of Federal Regulations, 33 CFR 207.440: https://www.ecfr.gov/current/title-33/chapter-II/part-207/section-207.440
  8. U.S. Government Accountability Office, Great Lakes Winter Shipping, GAO-24-106619: https://www.gao.gov/assets/870/867767.pdf
  9. Wikipedia, Soo Locks: https://en.wikipedia.org/wiki/Soo_Locks
  10. Wikipedia, Lake freighter: https://en.wikipedia.org/wiki/Lake_freighter
  11. Wikipedia, Welland Canal: https://en.wikipedia.org/wiki/Welland_Canal
  12. Wikipedia, Great Lakes Waterway: https://en.wikipedia.org/wiki/Great_Lakes_Waterway