The Soo Locks are a set of navigation locks on the St. Marys River at Sault Ste. Marie, Michigan. They carry vessels between Lake Superior and Lake Huron, past rapids with a drop of about 21 feet. The river is also the international border, and the Canadian city of Sault Ste. Marie, Ontario, stands on the opposite bank. The American locks handle almost all commercial traffic. The Canadian Sault Ste. Marie Canal, a heritage site run by Parks Canada, now serves recreational and tour boats.
This page describes the river, the locks on both sides of the border, their dimensions, the cargo that passes through, the winter closure and the construction of a new lock. It also sets out what is known about the Canadian canal and why the passage matters to lake shipping in Canada. Where sources disagree or no accepted source exists, the text says so.
The St. Marys River
The St. Marys River flows southeast from Lake Superior into the North Channel of Lake Huron. It is 74.5 miles (119.9 km) long and falls 23 feet (7.0 m) along its course. Average discharge is about 2,135 cubic metres per second. The river forms the border between Michigan and Ontario for its whole length.
Most of the fall occurs at the St. Marys Rapids, just below the outlet from Lake Superior. The Ojibwe name for the rapids, Baawitigong, means "at the cascading rapids". The rapids made the river impassable for large vessels, and the locks were built to bypass them. The drop that vessels must overcome at the locks is 21 feet (6.4 m).
Compensating works with 16 sluice gates, shared equally between the two countries, regulate the outflow from Lake Superior. On average, more than 93 percent of the flow is diverted to power generation and navigation. Two bridges cross the river between the twin cities. The Sault Ste. Marie International Bridge is a steel truss arch bridge for road traffic. The International Railroad Bridge lies directly to the west and carries a single track. The Parks Canada timeline records that the International Bridge over the canal was built in 1962.
The Soo Locks form one of the two principal engineering works of the Great Lakes Waterway. The other is the Welland Canal, which links Lake Ontario and Lake Erie and is described on the page about the Welland Canal and lock system. Dredged channels in the St. Marys, Detroit and St. Clair rivers and Lake St. Clair complete the connection between Lake Huron and Lake Erie. Lake Superior lies 601 feet (183 m) above sea level, so the Soo is the uppermost step in a chain of locks that reaches the Atlantic.
Operator and legal setting
The U.S. Army Corps of Engineers, Detroit District, owns and maintains the St. Marys Falls Canal, which contains the American locks, and provides passage without a lock fee. The Corps also manages the current construction project. The Canadian canal is administered by Parks Canada as a National Historic Site.
Passage through either country's locks does not require passports for vessels using the river, according to the encyclopedia entry on the river. The Soo Locks were designated a National Historic Landmark in 1966.
History of the locks
First locks
The first lock on the St. Marys River was built on the Canadian side in 1798 by the North West Company. It was destroyed in 1814, during the War of 1812, when an American force attacked the company's depot on 20 July.
The first American locks, known as the State Locks, were built between 1853 and 1855. They were two chambers in series, each 350 feet long, 70 feet wide at the top and 12 feet deep. The State of Michigan operated them until they passed to the U.S. Army in 1881.
Successive American locks
Several locks followed the State Locks, each larger than the one before.
The original Poe Lock was engineered by Orlando Poe. The encyclopedia entry on the river records that in 1939, 90 percent of the iron ore produced in the United States for domestic use passed through the waterway, which made it important to wartime production.
The active American locks
Only two of the American locks are in regular use. They differ greatly in size, and the difference decides which vessels can cross.
| Lock | Built | Length | Width | Depth | Notes |
|---|---|---|---|---|---|
| MacArthur | 1943 | 800 ft (240 m) | 80 ft (24 m) | 29.5 ft (9.0 m) | Handles ocean-going vessels that also have to fit the Welland Canal |
| Poe | 1896, rebuilt 1968 | 1,200 ft (370 m) | 110 ft (34 m) | 32 ft (9.8 m) | Only lock that takes the largest lake freighters |
Poe Lock
The Poe Lock was rebuilt after the opening of the St. Lawrence Seaway. One reference gives 1968 as the rebuild year, while a 2026 news item gives 1969 as the opening year, so the date is treated as unsettled. The chamber is 1,200 feet long and 110 feet wide and can carry a laden vessel of about 72,000 short tons (65,000 tonnes).
The Poe Lock is the only lock at the complex that can pass the 1,000-foot vessels. A reference on lake freighters states that thirteen of these ships were built, all U.S.-flagged, between 1,000 and 1,013.5 feet long, 105 feet wide and 56 feet deep in the hull. The longest is the Paul R. Tregurtha at 1,013.5 feet. The Corps of Engineers reports that over 88 percent of the commodity tonnage through the Soo Locks is restricted by vessel size to the Poe Lock.
MacArthur Lock
The MacArthur Lock opened in 1943 and replaced the older Weitzel Lock. It is 800 feet long, 80 feet wide and 29.5 feet deep. Vessels using it cannot exceed 730 feet in length or 75 feet in width. That limit is close to the Seawaymax size of 740 feet by 78 feet, the largest vessel that fits the locks of the St. Lawrence Seaway. For that reason the MacArthur Lock handles the ocean-going vessels that must also pass the Welland Canal and the Seaway. The corridor as a whole is covered on the page about the Great Lakes and St. Lawrence Seaway.
The lift
The Soo Locks lift or lower vessels by about 21 feet. The figure is the drop of the river between Lake Superior and Lake Huron at the rapids, and the Corps of Engineers uses the same figure for the elevation change at the St. Marys Falls Canal.
Traffic and cargo
The encyclopedia entry on the locks states that about 10,000 ships pass through in an average year. The accepted sources used for this page do not give an annual tonnage figure for the locks themselves. The cargo pattern can be described from the lake fleet as a whole.
Iron ore is the largest cargo on the Great Lakes. According to the reference on lake freighters, average annual iron ore shipments were 42.3 million tons from 2018 to 2022 and limestone 22.9 million tons, and U.S. ships carried about 79 percent of that total, mainly from American mines to American mills. Taconite pellets came into wider use in the 1940s, as higher-grade ore became scarcer. Ore from the upper lakes mainly supplies Midwest steel mills, and most of it moves out of Lake Superior ports and through the Soo.
The same source lists the main lake cargoes as iron ore, limestone, grain, salt, coal, cement, gypsum and sand. Average annual tonnage for 2018 to 2022 was as follows.
These figures describe the U.S.-flag lake fleet and should not be read as the throughput of the locks. The grain figure in particular is small because most grain on the lakes moves in Canadian vessels. The reference states that Canadian boats carried most of the potash and almost all of the salt and grain moved on the lakes. Grain from the Prairies, loaded at Thunder Bay on Lake Superior, reaches lower lakes and Seaway ports by way of the Soo Locks. The grain trade and its terminals are covered on the page about grain and bulk cargo shipping.
Winter closure and the season
Ice stops commercial shipping at the Soo each winter. The encyclopedia entry on the locks describes the closure as running from January through March, and the months without traffic are used for inspection and maintenance. The entry on the river describes a usable season from March through November. A news report on the 2026 season gave 15 January as the date of the last vessel through the Poe Lock and 25 March as its reopening date, with the closure described as about ten weeks. These dates vary from year to year with ice conditions and the decisions of the Corps and the carriers.
The Great Lakes Waterway entry notes that the U.S. Coast Guard usually provides one or more icebreakers to keep the passage open for part of the fall and early winter, and that shipping usually stops for two to three months afterward. On the St. Marys River, the Canadian Coast Guard ship Samuel Risley breaks ice to start the shipping season. A more general discussion is given on the page about icebreaking and winter navigation on the Great Lakes.
The Soo Locks Project
The Soo Locks Project, formally the New Lock at the Soo, is a construction program by the Army Corps of Engineers. Its purpose is to add a second lock of the same size as the Poe Lock, 110 feet by 1,200 feet, on the site of the decommissioned Davis and Sabin locks. The encyclopedia entry on the locks gives June 30, 2009, as the groundbreaking date and states that the aim is to add capacity for large lake freighters and replace the obsolete, infrequently used Davis and Sabin locks.
The reason for the project is the dependence on a single chamber: over 88 percent of tonnage is limited to the Poe Lock, so a failure there would stop most cargo. A 2015 Department of Homeland Security study cited by the Corps estimated that a six-month Poe Lock closure would reduce U.S. GDP by 1.1 trillion dollars.
The Corps describes three phases: deepening of the upstream channel (begun in 2020), rehabilitation of the upstream approach walls (begun in 2021) and, as Phase 3, the new chamber with downstream approach walls. A contract of 1.068 billion dollars for Phase 3 was awarded on July 1, 2022, to Kokosing Alberici Traylor, LLC, with construction expected to take seven years.
Cost estimates rose from 1.031 billion to 3.189 billion dollars fully funded, and completion is targeted for summer 2030.
The Canadian Sault Ste. Marie Canal
Origins
The canal stands on the Ontario bank. Its history is linked to an incident in 1870. In that year the United States refused passage through its locks to the steamer Chicora, which carried Colonel Garnet Wolseley and troops for the Red River Expedition. The expedition had to portage nearby. The episode is recorded as the main reason for building a lock on the Canadian side, so that Canadian traffic would not depend on American permission.
Construction ran in 1894 and 1895, according to Parks Canada, and the canal was finished in 1895 as the final link in an all-Canadian navigation route from the St. Lawrence River to Lake Superior. The plaque for the site describes it as the longest lock in the world and the first to operate with electrical power. The original lock chamber was 274 metres (899 feet) long and 18 metres (59 feet) wide, and the canal is about 1.6 km long.
Operation
Parks Canada reports that, in its first period of operation from 1895 to 1906, the canal handled 1,193 vessels carrying 748,371 tonnes of cargo. The timeline adds that responsibility passed to the St. Lawrence Seaway Authority in 1959 and to Parks Canada in 1979.
Closure and recreational lock
The canal was designated a National Historic Site of Canada on 20 November 1987. In the same year it was closed after a structural failure of the south wall. After nine years of negotiations, federal, provincial and municipal governments reached a tripartite agreement to build a smaller recreational lock inside the historic chamber. The new lock opened in 1998. It is 77 metres (253 feet) long, 15.4 metres (51 feet) wide and 13.5 metres (44 feet) deep, with a draft limit of 3 metres (9.8 feet).
Commercial shipping therefore does not use the Canadian canal. The 1998 chamber is far smaller than the MacArthur Lock, and it takes recreational boats and tour vessels. Major shipping uses the U.S. locks. One point on dates should be noted: a Parks Canada page states that 1979 was the year Parks Canada assumed responsibility and that the closure took place in 1987, while some secondary sources place the end of commercial use at 1979. This page follows the Parks Canada timeline.
Heritage status
The site keeps red sandstone buildings, including the powerhouse, and most of the original lock machinery. It receives about 100,000 land-based and 60,000 water-based visitors a year, according to Parks Canada.
Importance to Canadian lake shipping
Canadian lake carriers use the Soo Locks as a matter of course, since the Canadian canal does not take commercial vessels. The relevance to Canada comes from several features of the trade.
- Canadian vessels carry most of the grain and salt moved on the lakes and most of the potash, according to the reference on lake freighters. Grain loaded at Lake Superior ports passes the Soo on the way to the lower lakes and the Seaway.
- Thunder Bay, on Lake Superior, is listed among the major ports of the Great Lakes Waterway. Hamilton is the other Canadian port in the list. Cargo to and from Thunder Bay must use the Soo Locks unless it stays on Lake Superior.
- Larger Canadian lakers are less common, partly because of the American Jones Act. A Canadian vessel that trades below Lake Erie must fit the Welland Canal and the Seaway locks. The Poe Lock, at 1,200 by 110 feet, is much larger than the Seaway locks of 766 by 80 feet, so Canadian vessels of Seaway size fit comfortably through the MacArthur Lock and the Poe. The vessel types are described on the page about Canadian lakers. Toll and cost questions for the Seaway part of the route are taken up on the page about Seaway tolls and competitiveness.
No accepted source gives the Canadian share of Soo Locks tonnage, so that figure is left out.
Frequently asked questions
What are the Soo Locks?
The Soo Locks are locks on the St. Marys River at Sault Ste. Marie, Michigan, that lift and lower vessels by about 21 feet between Lake Superior and Lake Huron. They are owned and maintained by the U.S. Army Corps of Engineers, Detroit District, and passage is free.
How big are the Poe and MacArthur locks?
The Poe Lock is 1,200 feet long, 110 feet wide and 32 feet deep. The MacArthur Lock is 800 feet long, 80 feet wide and 29.5 feet deep. Only the Poe Lock takes the 1,000-foot lake freighters, while vessels in the MacArthur Lock may not exceed 730 feet by 75 feet.
Does commercial shipping use the Canadian canal?
No. The Sault Ste. Marie Canal opened in 1895 and closed in 1987 after a wall failure. Since 1998 a smaller recreational lock inside the historic chamber has taken recreational and tour boats. It is a National Historic Site of Canada, managed by Parks Canada.
When do the Soo Locks close for winter?
The closure runs roughly from January to March, when ice stops commercial traffic and the Corps carries out repairs. In 2026 the Poe Lock's last vessel passed on 15 January and the lock reopened on 25 March, according to a news report. Dates vary from year to year.
What is the Soo Locks Project?
It is the construction of a second Poe-sized lock, 110 by 1,200 feet, on the site of the Davis and Sabin locks. The Corps targets completion in summer 2030. A 1.068 billion dollar Phase 3 contract was awarded in July 2022, and the project's cost estimates have risen sharply since 2018.
What cargo passes through the locks?
Iron ore is the largest cargo on the lakes, followed by limestone and coal. Grain, salt, cement, gypsum and sand are also carried. Iron ore from Lake Superior ports supplies mills in the Midwest, and grain from Thunder Bay moves to the lower lakes.
Last updated 2026-11-18
Sources
- Soo Locks, Wikipedia
- Sault Ste. Marie Canal, Wikipedia
- St. Marys River (Michigan-Ontario), Wikipedia
- Great Lakes Waterway, Wikipedia
- Lake freighter, Wikipedia
- Sault Ste. Marie Canal National Historic Site of Canada, Parks Canada
- The Sault Canal: 125 Years of History, Parks Canada
- Corps of Engineers awards the New Lock at the Soo Phase 3 contract, U.S. Army