Westridge Marine Terminal is the point where crude oil from the Trans Mountain pipeline is loaded onto ships. It stands on the south shore of Burrard Inlet in Burnaby, British Columbia, inside the harbour of the Port of Vancouver. Trans Mountain Corporation, a federal Crown corporation, owns and operates the terminal as the marine end of the pipeline that runs from Alberta to the Pacific coast.

This page describes where the terminal is, what changed when the Trans Mountain Expansion Project entered service in 2024, how the three loading berths and the Aframax tankers that use them work, where the oil goes, and how tanker traffic, spill response and marine mammal protection are handled. Figures come from Wikipedia and from federal sources, and where those sources disagree the page says so.

Where Westridge Marine Terminal is located in Burnaby

Burrard Inlet is a shallow-sided fjord in the Lower Mainland of British Columbia. It is about 44 kilometres long at its maximum and opens west into the Strait of Georgia. Two constrictions divide it: the First Narrows, about 400 metres wide and crossed by the Lions Gate Bridge, and the Second Narrows, about 350 metres wide and crossed by the Ironworkers Memorial Second Narrows Crossing and a railway bridge. The stretch between the narrows is the busiest part of the Port of Vancouver, with railyards, container and bulk terminals, grain elevators and refineries along the shore.

Burnaby is one of the municipalities on the inlet. The Westridge terminal in Burnaby sits on that shore, and the oil it loads arrives through the Trans Mountain system, which also supplies the Burnaby Terminal and the nearby refinery. The wider port and its terminals are covered in the page on the Port of Vancouver.

A tanker bound for Westridge Marine Terminal passes through the Strait of Georgia, the Burrard Inlet entrance and the Second Narrows. Movements in these waters are monitored by the marine traffic service described in the page on vessel traffic services in Canada.

The Trans Mountain pipeline and oil export from Westridge

The Trans Mountain pipeline carries light and heavy crude oil and refined products from Alberta to British Columbia and Washington State. The existing line is about 1,150 kilometres long. Before the expansion its capacity was 300,000 barrels a day.

The Government of Canada bought the pipeline from Kinder Morgan in 2018 through Trans Mountain Corporation, a subsidiary of the Canada Development Investment Corporation. The corporation became a non-agent Crown corporation on 29 April 2022.

The Trans Mountain expansion had a long regulatory history. The main dates are these.

The Canada Energy Regulator reports that the expansion added 590 thousand barrels a day and brought the nameplate capacity of the system to 890 thousand barrels a day. Utilization ran at about 80 to 90 percent through the end of 2025. The regulator puts the export capacity of the Westridge terminal at 630 thousand barrels a day, which is the most western Canadian crude the system can deliver to it after the expansion.

What changed at Westridge Marine Terminal with the Trans Mountain expansion

Before the Trans Mountain Expansion Project, Westridge Marine Terminal handled about five vessels a month, according to Natural Resources Canada. The terminal has served for 70 years, and a team of 85 people operates the Burnaby and Westridge terminals around the clock.

The expansion added three new vessel loading berths. Westridge Marine Terminal can now receive 34 vessels a month. The earlier planning documents described the same change as a rise from 5 to 34 Aframax tankers a month. The 34 vessel figure is a capacity, not a count of actual calls in a given month, and no measured monthly average was found in an accepted source.

Before the expansion, 79 thousand barrels a day were set aside for the terminal, of which 54 thousand were committed to long-term shippers and 25 thousand were open to uncommitted shippers. The expansion raised the possible volume to the 630 thousand barrel export capacity described above.

Environmental conditions shaped the construction. Natural Resources Canada states that a rock reef complex was built as fish habitat, and that consultation with Indigenous communities led to one of the largest archaeological projects in Canada, which identified 80,000 artifacts. The Marine Mammal Protection Program includes 32 mitigation and monitoring measures.

Loading berths and Aframax tankers at Westridge Marine Terminal

The three berths are designed for Aframax tankers. An Aframax is a medium-size crude oil tanker class. The Canada Energy Regulator explains that draft restrictions limit Aframax vessels at Westridge to about 550,000 barrels of their 800,000-barrel capacity.

The reason is the depth of the channel. Dredging in Burrard Inlet is scheduled for completion in February 2028, and after that Aframax tankers can load to full capacity at Westridge. The role of dredging and pilots in Canadian ports is explained in the page on pilotage, ports and dredging.

The general role of tugs in Canadian waters is covered in the page on tugs and barges. Specific escort rules for Westridge tankers were not confirmed from an accepted source and are not described here.

Oil export: where the oil goes after loading

Aframax tankers loaded at Westridge Marine Terminal sail either directly to refining markets or to the Pacific Lightering Area off California. There the cargo is transferred to very large crude carriers, for the longer voyage to Asia.

Natural Resources Canada reports a change in oil export patterns. Before the expansion, 97 percent of Canadian oil went to or through the United States. Under the Trans Mountain Expansion Project, 65 percent of its volumes go to Asia, and nearly 10 percent of Canadian oil now goes to countries other than the United States.

The Canada Energy Regulator adds that the expansion allows more heavy crude to be exported from Westridge to Asia and the U.S. West Coast, and that monthly heavy oil volumes on the system have exceeded light oil volumes since start-up. Canadian crude exports by tanker rose from 270 thousand barrels a day in 2021 to 550 thousand in 2025. That figure is the national total for marine exports and not the Westridge volume alone.

For the wider picture of crude, products and gas shipped from Canadian coasts, see the page on oil and LNG marine transport. The gas side of the Pacific coast trade is covered under LNG export terminals.

Westridge terminal in Burnaby and the wider Trans Mountain system

The Westridge Marine Terminal is one of two Trans Mountain facilities in Burnaby. The Burnaby delivery point receives light crude and refined products for the Burnaby Refinery and for Suncor's Burrard Products Terminal. The refinery has a capacity of about 55 thousand barrels a day, and Sunoco acquired it on 31 October 2025 as part of its purchase of Parkland Corporation. Oil for export, by contrast, goes to the Westridge terminal in Burnaby and onto tankers.

The Canada Energy Regulator also lists further work on the system. The Drag Reducing Agent Project would add up to 90 thousand barrels a day from late 2026, and the Mainline Optimization Project, with an application filed on 27 August 2026, would add 210 thousand barrels a day in 2028 or later. A separate proposal, Pacific Link, would add one million barrels a day of export capacity following much of the existing Trans Mountain route.

Tanker traffic in Burrard Inlet and the Trans Mountain expansion

Tanker traffic was the main marine issue in the debate over the expansion. Stand.earth, an advocacy group, argued that the project would increase tanker traffic seven-fold and obstruct 30 percent of Burrard Inlet. These are the group's claims, not findings of a regulator.

The National Energy Board's later review was limited to new information on the effects of increased tanker traffic to and from the terminal, through Canada's 12-nautical-mile territorial sea. The Federal Court of Appeal had found that this subject was missing from the first assessment.

Trans Mountain's tanker traffic joins a busy harbour. Container ships, bulk carriers, cruise ships and ferries all use the same waters, and the page on cruise ships from Vancouver to Alaska shows how seasonal passenger traffic adds to it.

Spill response and marine safety

Spill preparedness for the terminal rests on the national regime for oil spills from ships, in which certified response organizations hold equipment and staff along the coast. On the West Coast that organization is the Western Canada Marine Response Corporation. Natural Resources Canada reports that it grew from about 60 people to nearly 200 as part of the expansion. The legal framework is set out in the page on the Canadian oil spill response regime.

Spills linked to the pipeline in Burnaby have occurred on land. In 2007 a contractor's rupture of a pipeline in Burnaby released between 224 and 234 cubic metres of crude oil, and some reached Burrard Inlet through the storm sewer system. In 2009, 305 cubic metres leaked from a tank at the Burnaby Terminal, and most flowed into a containment area. These episodes concern the pipeline and tank farm and not a tanker loading at the dock.

Whales and the Salish Sea

The tanker route crosses the Salish Sea, the feeding area of the southern resident killer whales, which depend on Chinook salmon. By November 2018 only 74 of these whales were counted. Concern for them was one of the reasons the court set aside the 2016 approval.

The Marine Mammal Protection Program reported by Natural Resources Canada, with its 32 measures, responds to that finding. How vessel noise affects the whales, and what limits exist, is described in the page on whales and vessel noise in Canada. Broader protected area rules appear in the page on marine protected areas and shipping.

Frequently asked questions

What is Westridge Marine Terminal?

Westridge Marine Terminal is the tanker loading terminal of the Trans Mountain pipeline, on Burrard Inlet in Burnaby, British Columbia. Crude oil arrives by pipeline and is loaded onto Aframax tankers for export.

How many tankers can Westridge Marine Terminal receive?

Natural Resources Canada states that the terminal received about five vessels a month before the Trans Mountain Expansion Project and can now receive 34 a month. That is a capacity figure.

How many berths does the terminal have?

The expansion added three new vessel loading berths, designed for Aframax tankers.

Why do Aframax tankers not load fully at Westridge?

Draft restrictions in the Port of Vancouver mean an Aframax can load about 550,000 barrels instead of about 800,000. Dredging in Burrard Inlet is scheduled for February 2028, after which full loading is possible.

Who owns the terminal?

Trans Mountain Corporation, a federal Crown corporation, owns and operates it. The Government of Canada bought the pipeline from Kinder Morgan in 2018.

Where does the oil export from Westridge go?

Tankers sail to refining markets or to the Pacific Lightering Area off California, where cargo moves to very large crude carriers bound for Asia. Natural Resources Canada says 65 percent of the volumes of the expansion go to Asia.

Last updated 2026-11-22

Sources

  1. Natural Resources Canada, news release on the Westridge Marine Terminal tour, October 2026: https://www.canada.ca/en/natural-resources-canada/news/2026/10/minister-mcknight-tours-westridge-marine-terminal-showcasing-canadas-ability-to-build-major-energy-infrastructure-responsibly0.html
  2. Canada Energy Regulator, Canada's Pipeline System 2026: Crude Oil: https://www.cer-rec.gc.ca/en/data-analysis/facilities-we-regulate/canadas-pipeline-system/2026/crude-oil/
  3. Wikipedia, Trans Mountain pipeline: https://en.wikipedia.org/wiki/Trans_Mountain_pipeline