Salt and stone are bulk cargoes carried on the Great Lakes. Road salt, limestone and other bulk stone move alongside iron ore and grain in the lake freighter fleet.

This page explains how these cargoes move. It covers the Goderich salt mine on Lake Huron, the way road salt reaches ports, the role of limestone and construction aggregates, the Canadian lakers that carry them, and the limits set by locks and the navigation season. Figures come from open sources, and the frontmatter lists items that could not be confirmed.

Why salt and aggregates move by water

The Great Lakes are a continuous water route between producing sites and consuming markets. The system is described in the page on Great Lakes and St. Lawrence Seaway shipping, and the wider context of trade between the two countries appears in the page on Canada–US Great Lakes trade.

Aggregate is the general term for the granular component of a composite material that resists compressive stress. In construction, sand and gravel are combined with cement to make concrete, and aggregates make up roughly 60 to 80 per cent of the volume of concrete and 70 to 85 per cent of its mass. A city that builds roads, bridges and foundations therefore needs a steady supply of crushed stone, sand and gravel.

Road salt has a different purpose and a similar shipping profile. Salt lowers the freezing point of water, so it melts ice on surfaces when the temperature is below 0 degrees Celsius. Cities in cold climates spread salt on roads, and many mix sand and salt for traction. Brine, which is salt dissolved in water, works better than dry salt because it sticks to the road. Highway deicing is also the largest business in the salt segment of Compass Minerals, which sells bulk rock salt to provincial, state and municipal governments and to road maintenance contractors.

The Goderich salt mine and harbour

The best known salt operation on the lakes is at Goderich, Ontario, on the eastern shore of Lake Huron. Salt was found there in 1866 by crews searching for petroleum, about 300 metres underground. The mine now lies 530 metres below the surface and extends over about 7 square kilometres under Lake Huron. Wikipedia calls it the largest underground salt mine in the world. The deposits belong to the Silurian-age Salina Formation.

Production figures vary by source and by year. Wikipedia's article on Goderich says about 150 million tons of salt had been produced by 2012, and that after investments capacity was expected to reach 9 million tons a year. The article on Compass Minerals gives the same 9 million tons as annual capacity, though that number carries a citation-needed tag. Wikipedia's article on rock salt, which names the mine the Sifto Salt Mine, gives a production of over 7 million tons a year, mined about half a kilometre beneath Lake Huron. The differences reflect different dates and the difference between capacity and output, so no single number should be read as current.

Goderich harbour is the link between the mine and the water. The town owns the harbour, and a private firm, Goderich Port Management Corporation, runs it under contract. It is an industrial harbour used mainly to load salt onto lake and ocean freighters. Piers built by the Canada Company between 1830 and 1850 were the first works, and a modern harbour was created in 1872. The Goderich lighthouse, which opened in 1847, was the first on the Canadian side of Lake Huron.

Two events in the town's recent history involved the salt industry. A strike by more than 350 mine workers represented by Unifor Local 16-0 began in 2018, lasted 12 weeks and ended in July of that year. On 21 August 2011 an F3 tornado struck the town, and a worker on a salt-mine dock died.

Goderich is one of several salt sources in Canada. Windsor Salt, founded in 1893 and headquartered in Pointe-Claire, Quebec, operates a mine in Windsor, Ontario, and one in Pugwash, Nova Scotia, and describes three rock salt mines in total. Some of its products are used by government agencies for winter road ice control.

Pugwash and salt shipped to sea

Not every salt cargo travels on the lakes. At Pugwash, on the Northumberland Strait in Nova Scotia, the salt deposit is 457.2 metres thick, and the Canadian Salt Company mine has been open since 1959. It is the only salt mine in the province and the only underground mine there. Output is about 1,200,000 tonnes a year, according to Wikipedia. Salt is shipped from a company-owned loading facility in the harbour, and large ships are seen there from early spring to late autumn. Some salt leaves by road, and some by rail from a facility at Oxford Junction.

Goderich, by contrast, sends salt onto both lake freighters and ocean-going vessels.

Limestone shipping and the bulk stone trade

Limestone is the second-largest cargo on the Great Lakes after iron ore. The article on lake freighters, citing the Lake Carriers' Association, gives average yearly cargo for 2018 to 2022 in millions of tons: iron ore 42.3, limestone 22.9, coal 10.0, cement 3.4, salt 0.9, sand 0.5 and grain 0.3, for a total of 80.4. The same article gives 81.4 million tons shipped on the lakes in 2023. Limestone is mainly unloaded at stone docks for the construction industry. The iron ore trade is covered in the page on Canadian iron ore shipping.

The figures above cover the entire lake system and combine American and Canadian shipping. They are a guide to scale rather than a measure of Canadian domestic traffic. The Canadian share of limestone and other aggregate cargo cannot be derived from the sources used here.

Sand has its own entry in the table at 0.5 million tons a year. For a wider picture of bulk goods, see the page on grain and bulk cargo shipping in Canada.

Aggregates lakers and self-unloaders

The ships that carry salt and stone are largely self-unloaders. A self-unloader discharges its own cargo with onboard conveyors, so it does not depend on cranes or dockside equipment. The first ship converted to self-unloading was the Hennepin in 1902, and the Wyandotte of 1908 was the first built as one. Owners adopted the type slowly, and it became more popular through the 1920s. The Wilfred Sykes was converted in 1975 with equipment mounted at the stern, and all later self-unloading equipment has followed that arrangement.

A Canadian example is Algoma Central Marine, a Great Lakes operator based in St. Catharines, Ontario, which operates a fleet of self-unloaders. Its vessels include the Algoma Mariner, launched in 2011, and the Algoma Bear and Algoma Endeavour, launched in 2024.

The thousand-footers are 1,000 to 1,013.5 feet long and 105 feet wide, with listed capacities from 58,000 to 80,900 tons. More detail on vessel classes is in the page on lakers, salties and tug-barges, and barge units are covered in Canadian tugs and barges.

Great Lakes St. Lawrence Seaway system and the Soo Locks

Salt, limestone and sand travel inside the Great Lakes St. Lawrence Seaway system, which opened in 1959 and has 15 locks, seven on the St. Lawrence River and eight on the Welland Canal. Ocean vessels can sail from the Atlantic Ocean as far as Duluth, Minnesota, at the western end of Lake Superior. The system has a Canadian operator and a United States operator, and the same page reports 37 million tons of cargo in 2024, according to Transport Canada. Grain shipments and steel imports are among the other bulk cargoes in the system, and the page on Great Lakes and St. Lawrence Seaway shipping covers them in more detail.

The Soo Locks at Sault Ste. Marie, on the St. Marys River, join Lake Superior and Lake Huron. The Poe Lock is 1,200 feet long, 110 feet wide and 32 feet deep and accepts ships carrying 72,000 short tons. The locks close from January through March, when ice stops shipping on the lakes. Cargo bound between Lake Superior ports and the lower lakes depends on this passage, as does iron ore limestone traffic in the opposite direction.

Locks, canals and ports on the salt and stone routes

Ship size is set by the locks. The largest vessel that can pass through the whole St. Lawrence Seaway, known as Seawaymax, is 740 feet long and 78 feet wide. Large vessels of the lake freighter fleet cannot travel downstream beyond the Welland Canal. The Welland Canal links Lake Erie and Lake Ontario, and its southern end is at Port Colborne, where Lock 8 is 420 metres long, one of the longest canal locks in the world. See the page on the Welland Canal and its lock system.

Canadian ports on the lakes handle these cargoes. Salt and stone ports are described alongside other terminals in the page on Canada's Great Lakes ports. Water levels are covered in the page on Great Lakes water levels and vessel draft.

Shipping season and winter road salt supply

The navigation season on the lakes typically runs from late March through mid-January, a pattern described in the page on Great Lakes shipping season dates. Road salt is needed in winter, but it can be shipped by lake vessel only while ships sail. Icebreakers keep the passage open for part of the fall and early winter, and shipping usually stops for two to three months after that. The work of icebreakers is covered in the page on icebreaking and winter navigation on the Great Lakes.

Related bulk cargoes and ship operators

Salt and stone share the lakes with other commodities, and ship operators move them alongside iron ore, grain shipments and steel products. Potash is described in the page on Canadian potash and fertilizer shipping, and coal and critical minerals are covered in the page on coal and critical minerals shipping.

Frequently asked questions

Where is the largest salt mine on the Great Lakes?

The Goderich mine in Ontario, on the eastern shore of Lake Huron. It lies 530 metres below the surface and extends over about 7 square kilometres under the lake. Wikipedia describes it as the largest underground salt mine in the world.

How is road salt shipped on the Great Lakes?

In loose bulk in the holds of lake freighters. Goderich harbour loads salt mainly onto lake and ocean freighters.

How much salt and limestone do lake ships carry?

Averages for 2018 to 2022 were 0.9 million tons of salt and 22.9 million tons of limestone a year, out of a total of 80.4 million tons for the whole lake system. These figures include American and Canadian shipping.

What is an aggregates laker?

A bulk freighter that carries crushed stone, sand or gravel for construction. Many bulk lakers are self-unloaders that discharge cargo with onboard conveyors, so they do not need dockside cranes.

Does Canada ship salt by sea as well as on the lakes?

Yes. At Pugwash, Nova Scotia, salt from the only salt mine in the province is shipped from a company-owned harbour facility, and large ships call there from early spring to late autumn.

Last updated 2026-11-22

Sources

  1. Wikipedia, Goderich, Ontario: https://en.wikipedia.org/wiki/Goderich,_Ontario
  2. Wikipedia, Compass Minerals: https://en.wikipedia.org/wiki/Compass_Minerals
  3. Wikipedia, Windsor Salt: https://en.wikipedia.org/wiki/Windsor_Salt
  4. Wikipedia, Pugwash, Nova Scotia: https://en.wikipedia.org/wiki/Pugwash,_Nova_Scotia
  5. Wikipedia, Lake freighter: https://en.wikipedia.org/wiki/Lake_freighter
  6. Wikipedia, Rock salt: https://en.wikipedia.org/wiki/Rock_salt
  7. Wikipedia, Aggregate (composite): https://en.wikipedia.org/wiki/Aggregate_(composite)
  8. Wikipedia, Algoma Central: https://en.wikipedia.org/wiki/Algoma_Central
  9. Wikipedia, Port Colborne: https://en.wikipedia.org/wiki/Port_Colborne
  10. Wikipedia, Great Lakes Waterway: https://en.wikipedia.org/wiki/Great_Lakes_Waterway