Roberts Bank Terminal Complex in Delta, British Columbia

Roberts Bank is a twin-terminal port facility on the mainland coast of the Strait of Georgia, in Delta, British Columbia. It is part of the Port of Vancouver and is often called the Outer Harbour of Canada's busiest port. Two terminals operate there. Westshore Terminals exports coal, and Deltaport, run by GCT Canada, handles containers. The port is run by the Vancouver Fraser Port Authority, a federal port authority created under the Canada Marine Act.

This page describes where the Roberts Bank terminal complex is, how it was built, what each terminal does, how cargo reaches it by rail, and how the proposed Roberts Bank Terminal 2 project fits into the plans of the port authority. It also sets out the environmental assessment of that project and the legal and policy steps taken so far. The material is a neutral reference summary of open sources, and figures are given with the year they refer to where the sources state one.

Location and setting of Roberts Bank

Roberts Bank lies in Delta, a municipality in the Lower Mainland of British Columbia, part of Greater Vancouver. Delta sits on the Fraser Lowland south of the south arm of the Fraser River, and Boundary Bay forms its southern edge. The municipality is about 27 kilometres south of Vancouver and about 22 kilometres north of the Canada-United States border at Peace Arch. The Tsawwassen First Nation holds lands at the mouth of the Fraser River in this area.

The terminals are not on a conventional waterfront. Like the Tsawwassen ferry terminal to the southeast, Roberts Bank was built at the end of a long causeway over a shallow bank. The ferry terminal at Tsawwassen opened in 1960 and connects to Vancouver Island and the Gulf Islands, a service described in the page on the BC Ferries system. The port was originally created as a pod of reclaimed land of 20 hectares, or 49 acres, intended for a major coal port. The footprint is now about four times that size.

The surrounding delta is a farming area, and much of Delta's flat, fertile land is preserved for farming under Agricultural Land Reserve regulations. The tidal flats beside the causeway are also a feeding area for migratory birds, which is why the port has been the subject of long environmental debate. That debate is covered in a later section.

The wider river system around the port, including dredging of the Fraser River channel, is described in the page on the Fraser River and BC inland shipping.

Roberts Bank in the Port of Vancouver

The Vancouver Fraser Port Authority was formed through an amalgamation that took effect on 1 January 2008. It combined the former Port of Vancouver, the North Fraser Port Authority and the Fraser River Port Authority. The merged body was first called Port Metro Vancouver. On 6 April 2016 the authority returned to the name Port of Vancouver for the port itself.

The authority is accountable to the federal Minister of Transport and operates under the Canada Marine Act. It is described as financially self-sufficient. The legal framework for such authorities is explained in the page on Canada port authorities and the Canada Marine Act.

Reference sources give these figures for the whole Port of Vancouver for 2022:

TEU means twenty-foot equivalent unit, the standard way of counting containers of different lengths. The port offers 29 deep-sea and domestic marine terminals in five sectors: automobiles, break-bulk, bulk, containers and cruise. Container terminals named in the reference are Centerm, Deltaport, Fraser Surrey Docks and Vanterm. Westshore Terminals is listed among the bulk terminals. Roberts Bank therefore holds one of the container terminals and the largest coal terminal in the port. A fuller portrait of the port is given in the page on the Port of Vancouver.

Timeline of the Roberts Bank superport

The facility is sometimes called the Roberts Bank Superport, a name used for the whole causeway complex.

  1. 16 April 1970: the port opens under the B.C. Harbours Board, with Westshore Terminals as its only tenant.
  2. 1983 to 1984: the port is expanded.
  3. June 1997: the second terminal, the GCT Deltaport container facility, opens.
  4. January 2010: Deltaport adds a third berth and doubles its capacity.
  5. Early 2010: Westshore completes a 49-million-dollar equipment upgrade, raising capacity from 24 million to 29 million tonnes per year.
  6. 7 December 2012: the bulk carrier Cape Apricot damages the Westshore causeway.
  7. 2020: the federal review panel report on Terminal 2 is delivered.
  8. 20 April 2023: the Government of Canada approves Terminal 2 subject to conditions.
  9. 10 January 2025: the Federal Court dismisses a Species at Risk Act claim against the approval.
  10. 30 October 2026: Terminal 2 is announced as listed under the Building Canada Act.

Westshore Terminals and the coal trade

Westshore Terminals was the first tenant of the port and is described as the busiest single coal export terminal in North America. It is operated by the Westar Group on a long-term contract. It typically ships more than 20 million tonnes of export coal a year. After the 2010 upgrade, capacity rose from 24 million to 29 million tonnes a year.

Some of the coal is metallurgical coal from mines in the interior of British Columbia, some of them operated by Teck Resources. Coal mined in the province pays a provincial carbon tax on its embodied emissions. Some of the coal shipped through the coal terminal at Roberts Bank is instead mined in the United States and exported through Canada to China. Communities on the United States West Coast have rejected proposals for coal export terminals for environmental reasons. Reference material therefore describes Roberts Bank as the route by which producers in the Powder River Basin can reach Asian markets by sea. That American coal does not pay the provincial carbon tax, a practice that has been criticised by environmental groups in British Columbia.

The wider flows of coal and other bulk minerals are described in the page on Canadian coal and critical minerals shipping.

The Cape Apricot incident

On 7 December 2012 the Panama-registered, Japanese-owned bulk carrier Cape Apricot struck the causeway at the Westshore coal terminal. About 100 metres of the structure was destroyed, including a coal conveyor system. Port Metro Vancouver's harbour master described it as the first marine accident in the 42-year history of the coal terminal. An estimated 30 tonnes of coal went into the water. The larger of the terminal's two coal-loading berths was disabled. The berth returned to service in February 2013, and the reconstruction of the causeway was completed in late April 2013.

Deltaport and the container terminal

Deltaport is the container terminal at Roberts Bank. It opened in June 1997 and is operated by GCT Canada Limited Partnership under a long-term lease. In January 2010 it added a third berth and doubled its capacity. Reference sources describe it as one of the busiest import and export container terminals in North America and a major hub for container trucking companies.

A separate project, the Deltaport Terminal Road and Rail Improvement Project, would raise the container capacity of the terminal by 600,000 TEU within its existing footprint.

The Port of Vancouver also has other container terminals at Centerm, Vanterm and Fraser Surrey Docks. Together these handled the roughly 3.5 million TEU reported for 2022. The national container picture is covered in the page on Canadian container shipping, and the competing northern gateway is described in the page on the Port of Prince Rupert.

No current annual container volume for Deltaport alone, and no berth length, could be confirmed from the accepted open sources, so neither is stated here.

Rail, tugs and marine services

Roberts Bank is served by the Roberts Bank Rail Corridor. Trains of CN Rail, CP Rail and BNSF Railway use it.

Seaspan International provides tugboat services to both terminals on the peninsula. Tug work in Canadian ports is explained in the page on Canadian tugs and barges.

Wider questions about how a closure or slowdown at one port affects the system are discussed in the page on Canadian port disruptions and the supply chain.

Roberts Bank Terminal 2

Roberts Bank Terminal 2, abbreviated RBT2, is a proposed three-berth container terminal at Roberts Bank in Delta. The proponent is the Vancouver Fraser Port Authority. The federal Major Projects Office describes it as a critical element of the Port of Vancouver Gateway Strategy.

According to the government project page, the terminal would add 2.4 million TEU of container capacity, which is described as an increase of about 50 percent for the Port of Vancouver. It would be built on 168 hectares of new industrial land. The major components are:

Reference material on the Port of Vancouver says the terminal could add 2.4 million TEU a year to meet forecast demand until 2030. The sources used here do not state a total capital cost or a construction schedule.

Economic claims

The government project page gives several estimates for the operating phase of the terminal. They are the government's own statements and have not been independently verified here.

The page also states that without added capacity Canadians could pay an additional 800 to 900 million dollars a year in shipping costs, starting as soon as 2031. With other supply chain investments, it says import container costs could fall by 25 percent and delivery times from Vancouver to Toronto could drop by 17 percent.

Environmental assessment and legal steps

The Roberts Bank Terminal 2 project went through a federal environmental assessment by an independent review panel. A 2020 report concluded that the expansion would have numerous adverse effects. Environment Minister Steven Guilbeault agreed with the findings but said the project was justified under the circumstances. On 20 April 2023 the Government of Canada approved the project subject to conditions that the port authority must meet during construction and operation. The decision statement was issued under section 54 of the Canadian Environmental Assessment Act, 2012.

Habitat and species concerns

Environmental groups and First Nations in Canada and the United States have opposed the expansion over the loss of habitat. Species named in reference material as potentially affected include orcas, salmon, the Western sandpiper and the barn owl. Scientists cited there say the apparently barren mudflats carry a biofilm that supplies roughly half of the migrating Western sandpiper's nutrition. A related theme, the effect of vessel noise on whales in the Salish Sea, is covered in the page on whales and vessel noise in Canada.

Court ruling

On 10 January 2025 the Federal Court dismissed a claim that Canada had breached the Species at Risk Act by approving the expansion in early 2023.

Federal listing and Indigenous agreements

The government project page records the following recent steps.

  1. 16 July 2026: the project is referred to the Major Projects Office as a pillar of the Gateway Strategy.
  2. July 2026: the office begins consultations with Indigenous communities, the province and federal permitting departments.
  3. 28 August 2026: a notice of a possible listing under the Building Canada Act is published in the Canada Gazette.
  4. 30 October 2026: the government announces the decision to list the project as a project of national interest under Schedule 1 of the Act.

The listing is meant to consolidate remaining federal authorizations into one Conditions Document and to coordinate other federal regulatory processes. Additional conditions are to be set in that document after consultation with Indigenous peoples, alongside the conditions already in the decision statement. The page says the port authority has mutual benefit agreements with 27 Indigenous communities and relationship agreements with the Tsawwassen First Nation and the Musqueam Indian Band. It also refers to federal measures intended to protect critical species and habitat in the Salish Sea.

Place in Canadian trade

Roberts Bank links Canadian exports of coal and imports of consumer and industrial goods in containers to Asian and other overseas markets. Its role is placed in the wider trade picture in the page on Canada's international trade by sea.

Frequently asked questions

What is Roberts Bank?

Roberts Bank is a twin-terminal port on the Strait of Georgia in Delta, British Columbia. It is part of the Port of Vancouver and has two terminals, Westshore Terminals for coal and Deltaport for containers.

When did the Roberts Bank terminals open?

The port opened on 16 April 1970 with Westshore Terminals as its only tenant. The Deltaport container terminal opened in June 1997, and a third berth was added in January 2010.

Who runs the Roberts Bank terminals?

The Vancouver Fraser Port Authority manages the port. Westshore is operated by the Westar Group, and Deltaport is operated by GCT Canada Limited Partnership under a long-term lease.

How much coal does Westshore Terminals ship?

It typically ships more than 20 million tonnes of export coal a year. A 2010 upgrade raised its capacity from 24 million to 29 million tonnes per year.

What is Roberts Bank Terminal 2?

It is a proposed three-berth container terminal that would add 2.4 million TEU of capacity on 168 hectares of new industrial land, according to the Major Projects Office. The government approved it on 20 April 2023 with conditions.

Why is Terminal 2 controversial?

A 2020 federal review panel report found numerous adverse effects, and environmental groups and First Nations have raised concerns about habitat for salmon, orcas and migratory birds. The Federal Court dismissed a Species at Risk Act claim on 10 January 2025.

Last updated 2026-11-22

Sources

  1. Wikipedia, Roberts Bank Superport: https://en.wikipedia.org/wiki/Roberts_Bank_Superport
  2. Major Projects Office, Roberts Bank Terminal 2: https://www.canada.ca/en/privy-council/major-projects-office/projects/national/roberts-bank.html
  3. Wikipedia, Vancouver Fraser Port Authority: https://en.wikipedia.org/wiki/Vancouver_Fraser_Port_Authority
  4. Wikipedia, Port of Vancouver: https://en.wikipedia.org/wiki/Port_of_Vancouver
  5. Wikipedia, Delta, British Columbia: https://en.wikipedia.org/wiki/Delta,_British_Columbia